Main Countries Buy Rent

Flat 50 м² in Bar, Montenegro

173 848 $

3 476 $ /м²

4Oj2e
Share:

Area

50 м2

Bedrooms

1

Apartment in Bar. City - Bar

Description

One-bedroom apartment in the center of the Bar


For sale an apartment of 50 m2 on the 8th floor of a new house in the center of Bar. The windows offer views of the sea and the mountains. The distance to the sea is 650 meters.


Planning includes a living room with kitchen and a separate bedroom. The apartment is sold with all furniture and appliances. In the bathroom is installed underfloor heating.


In walking distance there are shops Aroma and Idea, sports complex Topolitsa and Soho-park. Convenient location suitable for permanent residence, rest and rent.

Additional details

Property type

Residential Properties

Number of rooms

1

Floor

8

Object type

Flat

Price

173 848 $

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (173 848 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections