Main Countries Buy Rent

Flat 50 м² in Bodrum, Turkey

211 137 $

4 222 $ /м²

4OfQQ
Share:

Area

50 м2

Bedrooms

1

Year of construction

2026

Apartments in Bodrum on the first line. Sea view! (002323)

, the location is located in the winter/div>

Services and facilities

Balcony or terrace
Pool
Garage/parking
Security system
Lift

Additional details

Property type

Residential Properties

Object type

Flat

Price

211 137 $

Characteristics

Balcony or terrace
Pool
Garage/parking
Security system
Lift
Sea View

Infrastructure

Playground
Backup power generator

Distance to key points, m

To airport 100000
To sea 5
To center 250000

Purchase method

Installment plan

FAQ

In Turkey a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bodrum; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Turkey finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Turkey takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bodrum short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (211 137 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bodrum: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections