Main Countries Buy Rent

Villa 300 м² in Bar, Montenegro

929 632 $

3 098 $ /м²

4Odty
Share:

Area

300 м2

Bedrooms

6

Villa in Catalonia. City - Barcelona

A modern villa is offered for sale in the city of Bar, in the Zalyovo area. The two-story villa is fully furnished and ready for living. The villa has an area of 300 m2, featuring 6 bedrooms, 6 bathrooms, a living room, and a kitchen-dining area. It is situated on a land plot of 550 m2, which includes 2 large garages and a swimming pool. The villa offers a view of the city. Water and electricity are municipal, and there is a septic system for sewage. There are two types of heating (electric and solar panels). The center of Bar is 7 km away.

Additional details

Property type

Residential Properties

Number of rooms

6

Object type

Villa

Price

929 632 $

Characteristics

Sea View

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (929 632 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections