2 bedrooms, 1 nursery, plus 1 room with access to the balcony, 2 bathrooms, 2 terraces with beautiful views of the bay, with all furniture and appliances, everywhere heated floors. Upper floor. 100 meters to the sea. Undeveloped direct panoramic view of the Bay of Kotor. Parking space in front of the house.
Details
Location: Kotor
Bedroom number: 3
Square: 114 m2
Floor: 3
The number of bathrooms: 2
Amenities and benefits
First line
View of the mountains
Sea view
Household appliances
Open parking
Terrace
Furniture
New building
Additional details
Property type
Residential Properties
Number of rooms
3
Object type
Flat
Price
355 139 $
Characteristics
Sea View
FAQ
In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Kotor; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Kotor short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (355 139 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Kotor: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).