Main Countries Buy Rent

Flat 227 м² in Dobra Voda, Montenegro

651 773 $

2 871 $ /м²

4OfeK
Share:

Area

227 м2

Bedrooms

3

Apartment in Bar. The city is Dobra Voda.

Penthouse in the complex on 1 line
Location - Good Water
Complex - Sveti Luke
Square 227 m2
The area of the apartment is 126 m2 and the terrace area is 101 m2
Planning: living room with kitchen, 3 master bedrooms, each bathroom, in the cordior is an additional fourth bathroom,
On the territory of the complex pool, elevator.
Price 550 000 euros

Additional details

Property type

Residential Properties

Number of rooms

3

Object type

Flat

Price

651 773 $

Characteristics

Sea View

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Dobra Voda; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Dobra Voda short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (651 773 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Dobra Voda: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections