Main Countries Buy Rent

Land 50 м² in Bar, Montenegro

226 448 $

4 528 $ /м²

4Ofe2
Share:

Area

50 м2

Bedrooms

1

Plot of land in Bar. City - Bar

A large plot with a house in the Green Belt just 150 meters from the sea!
The area of the plot is 755 m2
The area of the house is 50 m2
The house consists of two apartments with separate entrances.
The apartments consist of a corridor, room, kitchen, bathroom and a large common terrace. Possible construction of the second floor.
The site offers a beautiful view of the sea.
Distance to the sea is only 150 meters!
div>
The plot is buried in greenery - pine trees, fruit trees. The land has passed the urban plan, it is possible to build a house up to 400 m2 with a garage.
Urban water.
Price - 245,000 euros

Additional details

Property type

Land

Object type

Land

Price

226 448 $

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (226 448 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections