Main Countries Buy Rent

Land 1 м² in Utjeha, Montenegro

35 299 $

35 299 $ /м²

4OgB1
Share:

Area

1 м2

Land plots with a sea view

Land with sea views in Uteha, Bar.

The total land area is 5812 m2.

It is possible to purchase plots of 500 m2 and above
All sections are located near the main highway Bar - Ulcinj.

Electricity at the border of the land.

The access road.
The land is suitable for construction with subsequent legalization

A quiet place, to the sea 700 meters

Additional details

Property type

Land

Object type

Land

Price

35 299 $

Land area

500

Distance to key points, m

To sea 700

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Utjeha; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Utjeha short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (35 299 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Utjeha: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections