Main Countries Buy Rent

Land 1 м² in Dobra Voda, Montenegro

54 511 $

54 511 $ /м²

4Og6S
Share:

Area

1 м2

Flat plots in Dobra Voda

Smooth areas in the Good Water

The area of each of the two plots is 346 m2 (46,000 euros), together 692 m2 (90,000 euros)

Smooth cleared areas in a quiet and green part of Good Waters-Dubrava.

The asphalt road to the sites.

Electricity at the border
On the plot of 6 adult olives (each can be sold for 1000 euros).
View of the mountains, village.

Infrastructure is available.

To the sea 1.7 km

Plots are not urbanized.

Additional details

Property type

Land

Object type

Land

Price

54 511 $

Land area

346

Distance to key points, m

To sea 1700

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Dobra Voda; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Dobra Voda short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (54 511 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Dobra Voda: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections