Main Countries Buy Rent

Land 1 м² in Dobra Voda, Montenegro

72 880 $

72 880 $ /м²

4OctQ
Share:

Area

1 м2

Urbanized plot of land

Urbanized plot of land for construction in Dobra Voda.

Plot area 500 m2.

Water and electricity at the boundaries of the plot.

View of the sea and mountains.

The plot of land is located in the residential zone.

Permitted construction on plots with a construction index of 1.8.

Maximum resolved construction of the building up to 7 visible floors.

Comfortable access road.

Distance to the sea 700 m.

Additional details

Property type

Land

Object type

Land

Price

72 880 $

Land area

500

Distance to key points, m

To sea 700

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Dobra Voda; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Dobra Voda short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (72 880 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Dobra Voda: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections