Main Countries Buy Rent

Land 1 м² in Bar, Montenegro

183 681 $

183 681 $ /м²

4OctS
Share:

Area

1 м2

Flat plot of land for construction in Polje

Flat plot of land for construction in Polje.

Plot area 1015 m2.

Water and electricity on the plot.

Fenced area.

Convenient access road.

Quiet place.

Distance to the sea 3.5 km.

Distance to the center of Bar with all the developed infrastructure 4 km, 8 minutes by car.

There is a grocery store within walking distance.

Suitable for the construction of a private house or a small apartment building

Additional details

Property type

Land

Object type

Land

Price

183 681 $

Land area

1015

Distance to key points, m

To sea 3500

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (183 681 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections