Main Countries Buy Rent

House 120 м² in Tivat, Montenegro

437 280 $

3 644 $ /м²

4OcsD
Share:

Area

120 м2

Bedrooms

4

Year of construction

2000

House in Kalimanj

The house is located 600 meters from the sea in the Kalimanj area

Plot area 702 m2

House area 120 m2

The house consists of two apartments with 2 bedrooms

It is possible to build another facility on the site, or add on to an existing one with an area of ​​up to 294 m2, 2 floors

Additional details

Property type

Residential Properties

Floor

2

Object type

House

Price

437 280 $

Land area

702

Distance to key points, m

To sea 400

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Tivat; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Tivat short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (437 280 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Tivat: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections