Main Countries Buy Rent

House 90 м² in Sutomore, Montenegro

64 288 $

714 $ /м²

4Ocq7
Share:

Area

90 м2

Bedrooms

3

Year of construction

2023

New unfinished two-story house

New unfinished two-story house in Sutomore.

House area 90 m2.

Plot area 223 m2.

Structure of the house: spacious apartment - studio, two bedrooms, two bathrooms, two terraces.

Internal staircase.

Electricity supplied.

The house is being without finishing.

View of the sea and mountains.

Convenient access road.

Quiet place.

Within walking distance there is a public transport stop, grocery and construction stores.

Distance to the sea 2 km, walk 25 minutes.

Additional details

Property type

Residential Properties

Floor

2

Object type

House

Price

64 288 $

Land area

223

Distance to key points, m

To sea 2000

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Sutomore; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Sutomore short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (64 288 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Sutomore: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections