Main Countries Buy Rent

Flat 55 м² in Mrcevac, Montenegro

111 043 $

2 018 $ /м²

4Of2u
Share:

Area

55 м2

Bedrooms

2

Bathrooms

2

Year of construction

2025

Apartment in the construction stage

2-bedroom apartment with a total area of ​​55 m2 under construction.

Planned completion of the facility: October 2025

The apartment will be delivered with interior decoration, plumbing and air conditioning.


Features:

The apartment is legalized, there is a Property Sheet

The building has 6 apartments of the same layout


Location:

Mrcevac settlement, near the city of Tivat with all social infrastructure

Tivat airport 1 km

The nearest beach 2 km

Services and facilities

Air conditioner

Additional details

Property type

Residential Properties

Object type

Flat

Price

111 043 $

Characteristics

Air conditioner

Distance to key points, m

To sea 2000

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Mrcevac; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Mrcevac short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (111 043 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Mrcevac: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections