Main Countries Buy Rent

Land 1 м² in Zabljak, Montenegro

117 267 $

117 267 $ /м²

4OdtR
Share:

Area

1 м2

Urbanized areas in Žabljak, Kovačka Dolina

Urbanized plots on Žabljak, Kovačka Dolina
Plot area 1000m2
The purchase of up to 20000m2 is possible.
Water and electricity in the immediate vicinity.
The plots are flat.
Road to the plot.
View of the mountains, forests.
A great location, not far from Zabljak surrounded by tourist facilities and infrastructure.
Building coefficient 0,3-0,6
Possible construction of objects up to 3 floors (P+1+PK)

Additional details

Property type

Land

Object type

Land

Price

117 267 $

Land area

1000

Distance to key points, m

To sea 120000

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Zabljak; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Zabljak short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (117 267 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Zabljak: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections