528 868 $
Stoliv, Montenegro
Plot area 813 m2 House area 104 m2, located in Stoliv on the first line. On the ground floor: 2 bedrooms, kitchen, living room and bathroom. On the second floor: 3 bedroo...
Urbanized area for construction
The urbanized site is located in Radovichy, next to the elite complex Lustica Bay
The area of 1760 m2
The construction of two buildings on 3 floors, with an area of up to 600 m2 each with a swimming pool, a spa center and tp
The technical conditions for construction are obtained, you can start from September 2025
The asphalt road to the site, water and electricity pass along the border
To one of the best beach area 1.5 km/nbsp>
In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Radovici; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Radovici short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (492 491 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Radovici: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).