Main Countries Buy Rent

Land 1 м² in Bar, Montenegro

49 122 $

49 122 $ /м²

4Ocsw
Share:

Area

1 м2

Plot on the road to Sutorman

Plot on the road to Sutorman, near the Todorovic Palace


Plot area 800 m2


The plot is located 40 m along the road and 20 m inland.


View of the mountains and nature of Montenegro.


A very green and quiet place where mushrooms and wild berries grow

Asphalt road to the plot.


Water and electricity need to be supplied.


Construction is planned in the surrounding area, it is possible to supply urban services.


An excellent place to build a villa, a house or a summer house in this secluded place, but at the same time not far from the city.


To the sea and the beach 11 km.

To the center of Bar 9 km.

Additional details

Property type

Land

Object type

Land

Price

49 122 $

Land area

800

Distance to key points, m

To sea 11000

FAQ

In Montenegro a residence permit is typically issued based on a minimum investment threshold. Applications are reviewed within 30–60 days in Bar; you will need a passport, proof of funds, and the ownership documents. Hatamatata helps prepare and submit the paperwork.
Banks in Montenegro finance 50–70% of the property value for non-residents with rates of 3–5% for 20–30 years. A life insurance policy and a 30–40% down payment are usually required. Terms and programs vary by city and bank.
Expected expenses: transfer tax 0–15%, registration 0.5–2%, notary 0.5–1.5%, agent commission 0–3%. In total 2–20% on top of the purchase price. Exact rates depend on region, property type and programs.
A title search at the land registry of Montenegro takes 10–15 business days. You receive ownership, encumbrance and tax clearance certificates. Documents are translated and reviewed by a lawyer before signing.
Yes. Rental income tax is 5–25% depending on the regime. In Bar short-term tourist rentals typically yield 5–8% per year. Municipal permission and income registration are usually required.
Yes. An inspection costs about 0.5–1% of the price (49 122 $) and covers structure, utilities and legal status. Hatamatata arranges a qualified engineer with an EN/RU report.
A typical transaction runs 30–90 days, averaging 45 in Bar: due diligence (10–15 days), notarization (5–7 days), registration (10–14 days), residence permit (30–60 days, if needed).

Related sections